Building historically dedicated to corporate HQ. 100% occupied as ostoday. Construction dates 1969 but it has been refurbished in 1994. Within Life and Science strategy the goal is to become institutional HQ of Bio/ Tech company of academic/ cultural organizations.
10 min. to Plaza Castilla
15 min. to Chamartín train station 5 min. to nearest train station
15 min. to Plaza Castilla
Services
restaurant area
The Tres Cantos area is well connected by both public and private transport. The Tres Cantos commuter train station is located nearby. Quick access to the M-607 and M-40 roads.
M² Available: 2,720
Surface Area (m²)
Ground floor: 880
First floor: 640
Second floor: 400
Third floor: 400
fourth floor: 400